Well, hello, everybody. This is another edition of the Agile Executive Podcast.

2
00:00:05,320 --> 00:00:10,500
And as always, this is one of your co-hosts, Michael Coté, available at peopleoverprocess.com.

3
00:00:10,600 --> 00:00:14,040
And we have one of the other co-hosts with us today. Would you like to introduce yourself?

4
00:00:15,980 --> 00:00:23,540
Hello, everyone. This is Israel Gat. I do the Agile Executive blog together with Coté.

5
00:00:24,380 --> 00:00:30,840
And I am delighted for us to have our guest today. Would you like to introduce yourself?

6
00:00:32,160 --> 00:00:38,520
Sure. This is Jim Highsmith. And I'm one of the authors of the Agile Manifesto.

7
00:00:39,180 --> 00:00:44,840
And I head up the Agile Consulting Practice for the Cutter Consortium.

8
00:00:45,980 --> 00:00:53,300
And along those lines, I mean, for people who aren't sort of like, haven't been curating their Agile library,

9
00:00:53,540 --> 00:01:00,600
over the years. I mean, can you give us kind of like a brief background of how you came to sort of be

10
00:01:00,600 --> 00:01:07,420
one of the strong voices in the Agile world? Like, how did you evolve into being involved as you are in Agile?

11
00:01:08,100 --> 00:01:13,280
Well, during the 1980s, I was very involved in more traditional methodologies.

12
00:01:14,020 --> 00:01:22,220
And towards the early part of the 1990s, I began to really question if it mirrored the way I actually worked.

13
00:01:23,020 --> 00:01:30,720
And in the early 1990s, I started doing rapid development, which was sort of, for me, the precursor to Agile.

14
00:01:31,080 --> 00:01:35,520
And did a lot of that all during the 1990s.

15
00:01:35,720 --> 00:01:40,640
Started writing my first book in the mid-90s, Adaptive Software Development.

16
00:01:41,380 --> 00:01:47,600
And then, as it got fairly close to publishing that book, I had known about DSDM.

17
00:01:47,700 --> 00:01:53,820
I had known about Scrum as sort of parallel types of efforts going on.

18
00:01:54,320 --> 00:01:59,360
And I found out about XP just before Kent wrote his book.

19
00:02:00,080 --> 00:02:02,360
And he and I had some conversations.

20
00:02:02,760 --> 00:02:04,280
And he looked over my book.

21
00:02:04,580 --> 00:02:10,680
And that led to some meetings, which eventually led to the group that wrote the Agile Manifesto.

22
00:02:11,520 --> 00:02:11,620
Right.

23
00:02:11,840 --> 00:02:15,760
And it's interesting, the background you have.

24
00:02:15,800 --> 00:02:22,360
Because I've always been curious, like, kind of what the comparison is between just rapid development and Agile development.

25
00:02:22,360 --> 00:02:25,560
Because they seem to both be going towards the same thing.

26
00:02:25,560 --> 00:02:30,220
But they're obviously sort of distinct philosophies, if you will.

27
00:02:30,340 --> 00:02:33,900
I mean, what do you think was different about rapid development?

28
00:02:35,120 --> 00:02:41,140
I think rapid development, and it really got started in the early 90s and lasted for a few years.

29
00:02:42,520 --> 00:02:47,520
And, again, it was kind of the early look at how to do iterative development.

30
00:02:48,020 --> 00:02:50,840
But it had sort of a different philosophy behind it.

31
00:02:50,960 --> 00:02:53,020
It was oriented towards small projects.

32
00:02:53,260 --> 00:03:00,300
It was oriented towards kind of quick and dirty projects as opposed to sort of well-crafted projects.

33
00:03:01,540 --> 00:03:12,680
And it was also built on, you know, Barry Beam's smile model and Tom Guild's evolutionary models that came out in the late 1980s.

34
00:03:12,800 --> 00:03:22,980
But I think it just sort of evolved into, you know, the different precursors kind of of the Agile movement.

35
00:03:22,980 --> 00:03:32,960
And the RAD stuff never got really as big a foothold as Agile has.

36
00:03:33,900 --> 00:03:36,480
And so it just – I think it was kind of an evolutionary process.

37
00:03:37,360 --> 00:03:42,620
I mean, I first started calling mine radical software development in the mid-90s.

38
00:03:42,640 --> 00:03:46,540
And then that evolved as I got into complex adaptive systems theory.

39
00:03:46,640 --> 00:03:48,680
I said, oh, this is really adaptive development.

40
00:03:48,900 --> 00:03:50,900
So that was the evolution for me.

41
00:03:50,900 --> 00:03:57,980
Yeah, and it seemed like RAD development suffered from sort of tools vendor takeover, if you will.

42
00:03:58,320 --> 00:04:02,320
And there was – you know, there was definitely a body of knowledge aside from itself.

43
00:04:02,540 --> 00:04:13,440
But then there were several – you know, it's interesting to see these trends happen over and over again where there's sort of an idea of how some technology or, in this case, software development should do.

44
00:04:13,500 --> 00:04:15,980
And then it sort of becomes defined by the tool itself.

45
00:04:16,640 --> 00:04:17,320
I think so.

46
00:04:17,420 --> 00:04:21,420
And I think that happened – I think you're right with the RAD movement because there were a lot of RAD tools out there.

47
00:04:21,920 --> 00:04:25,500
And interestingly enough, I think in the Agile movement, it's been the other way around.

48
00:04:25,720 --> 00:04:40,080
I think the Agile concepts and practices have really preceded and to some extent kind of dominated the tools, although there are, you know, a handful of tools out there now that, you know, that are doing Agile stuff.

49
00:04:40,080 --> 00:04:43,460
But I think the movement itself was pretty rich before that happened.

50
00:04:43,800 --> 00:04:47,040
Yeah, I mean, it's interesting in the Agile school of thought.

51
00:04:47,180 --> 00:04:50,720
There's not – you can't really buy like a – well, that I can think of.

52
00:04:50,760 --> 00:04:54,440
There's not like the Agile suite where you just buy that suite of tools and you're done.

53
00:04:54,980 --> 00:05:02,300
I mean, instead there's very – in very much the definition of what a tool is, there's lots of tools you can get to kind of assemble together.

54
00:05:02,420 --> 00:05:06,680
But you can't buy the work shed of pre-integrated tools together.

55
00:05:06,920 --> 00:05:20,400
No, and I think there's – I think, you know, at least one reason for that is that Agile is really rich in what Josh Kariefsky was talking to me about when we were in China together a couple of weeks ago.

56
00:05:21,300 --> 00:05:27,580
And so you have really management agility and technical agility, and they are very complementary of each other.

57
00:05:28,640 --> 00:05:31,980
And you need a whole different set of tools for each one.

58
00:05:32,320 --> 00:05:36,380
And so you don't really have an Agile tool.

59
00:05:36,520 --> 00:05:46,180
You have kind of a suite of Agile tools to support different kinds of things, project management, collaboration, continuous integration, and all the technical areas.

60
00:05:46,180 --> 00:05:49,340
And so nobody has the tool at this point.

61
00:05:49,820 --> 00:05:49,840
Yeah.

62
00:05:50,080 --> 00:05:56,060
You know, on a tangentially related topic, you mentioned being over in China recently.

63
00:05:56,240 --> 00:06:09,800
And when I was looking through some of your older blog posts, you were mentioning that, you know, I'm always interested in how cultural differences affect software development, if you will, and culture across all sorts of vectors.

64
00:06:09,800 --> 00:06:28,040
And in one of the posts you were saying, it was a post about instead of talking about self-directed teams, which people might associate with anarchy, you know, having a different phrasing for that rather than sort of giving people the idea that these teams of people are deciding critical things and so forth and so on.

65
00:06:28,580 --> 00:06:40,040
And there was an interesting kind of a side that you had that the ways you apply Agile, you know, in China might be different than how you would apply it in, you know, in Europe versus how you would apply it in South America or different places like that.

66
00:06:40,040 --> 00:06:51,120
And I'm curious, since you mentioned being in China, like when you see Agile applied in different geographies as to choose one sort of cultural thing, like how things are panning out to be different with Agile?

67
00:06:52,120 --> 00:07:01,400
Well, it is. It's very different. And one of the things that I wrote recently about is the difference between impediments and barriers.

68
00:07:01,920 --> 00:07:07,940
And an impediment is something with training, money, time, persistence, you can hope to overcome.

69
00:07:08,780 --> 00:07:20,720
And a barrier is something that is culturally related, either within a company or a country or some combination of that, that really is like smacking your head up against the wall to try to overcome that barrier.

70
00:07:21,320 --> 00:07:28,620
And that in those kinds of instances, we have to look at adapting Agile to the situation as opposed to the other way around.

71
00:07:29,700 --> 00:07:36,660
And I think there are a lot of people who just think, you know, there's the Agile set of stuff and we have to do that everywhere.

72
00:07:36,660 --> 00:07:47,020
But you really do have to look at different cultures and companies in terms of particularly a lot of the management stuff.

73
00:07:47,420 --> 00:07:49,660
But there's also some of the technical stuff.

74
00:07:49,740 --> 00:07:56,320
Now, there's several articles running around about the difference in a feature focus and a component focus.

75
00:07:56,560 --> 00:08:11,300
And when you get somebody that's building a huge application, i.e. 5 or 10 million lines of code, you know, there are certain subsets of those teams that probably need to be component teams rather than feature teams.

76
00:08:11,300 --> 00:08:14,600
So there is a lot of cultural stuff.

77
00:08:14,660 --> 00:08:23,120
And it's why a transition to Agile is not a step one, two, three, four kind of transition.

78
00:08:23,120 --> 00:08:29,640
It really does require a lot of thought about companies and cultures and organizations.

79
00:08:30,260 --> 00:08:41,220
And I was someplace recently and they were asking me about organizational structure and, you know, and I hadn't been with the company very long, didn't know a whole lot about them.

80
00:08:41,240 --> 00:08:48,020
And I said, you know, I can I can make some recommendations based on what an Agile philosophy would would say.

81
00:08:48,260 --> 00:08:53,820
But I can't make organizational recommendations without knowing a lot about your individual company.

82
00:08:54,280 --> 00:08:54,640
Yeah, yeah.

83
00:08:54,980 --> 00:09:04,200
There's sort of I mean, you have to know sort of the ethos of the company before you can start screwing around with like big organizational issues and figure out its goals and everything.

84
00:09:04,380 --> 00:09:12,640
I mean, there's I mean, that that that is I mean, that's another interesting leap in Agile that kind of gets to the the the new edition of your of your book that's out.

85
00:09:12,640 --> 00:09:22,060
And that's figuring out when you sort of move Agile above the sort of product or team level and how it kind of gets its its tendons and tendrils out into the rest of the business.

86
00:09:22,840 --> 00:09:31,240
And I mean, along those lines, like having looked over some of the the new information and the or an overview, I should say, of the the stuff in the new edition.

87
00:09:31,360 --> 00:09:39,660
I mean, what what what what have you what have you been adding to to the the book in the second edition that kind of addresses fitting Agile into the bigger context?

88
00:09:40,160 --> 00:09:48,560
Well, I've really added four new chapters and revised a bunch of the stuff that was in previously.

89
00:09:49,200 --> 00:09:59,020
But the four things that I really focused on that I would say lead to both bigger projects and to more of an enterprise kind of stuff.

90
00:09:59,500 --> 00:10:11,620
One is on advanced release planning, just a bunch of topics about planning an overall project or release that I thought were pretty important because there are, again,

91
00:10:11,740 --> 00:10:17,540
some in the Agile community that tend to focus more on the iteration at a time as opposed to the project at a time.

92
00:10:17,880 --> 00:10:17,960
Yeah.

93
00:10:18,400 --> 00:10:19,440
Secondly, scaling.

94
00:10:19,920 --> 00:10:29,200
And there's a number of things out there about scaling now, but I really focused on scaling self-organizing teams.

95
00:10:29,400 --> 00:10:40,980
How do you build a hundred or five hundred person Agile team as opposed to, you know, the structure of the product and the architecture, although I go into that a little bit?

96
00:10:41,920 --> 00:10:51,040
The third area, and this is one of the things that you run into a lot with big companies, particularly if they're doing combinations of hardware and software development,

97
00:10:51,700 --> 00:11:02,880
are governance issues around the – they've never worked with a hardware company or in one of those bigger organizations.

98
00:11:03,540 --> 00:11:08,040
They haven't been really introduced to PhaseGate, but I run into that in a lot of big companies.

99
00:11:08,640 --> 00:11:11,740
And a PhaseGate system is a very linear system of governance.

100
00:11:12,540 --> 00:11:19,720
And so one of the things I've done is to find a kind of Agile way to work into that governance model.

101
00:11:20,260 --> 00:11:33,560
And then finally, and to me is the most important, is that if we really want to bring agility into organizations,

102
00:11:33,980 --> 00:11:37,140
then we really have to change the way we measure performance.

103
00:11:37,880 --> 00:11:45,460
Right now, most projects are managed by the old iron triangle of scope, schedule, and budget.

104
00:11:46,160 --> 00:11:50,540
And so on the one hand, we tell Agile teams, be flexible, be adaptable.

105
00:11:51,020 --> 00:11:54,860
And on the other hand, we say, but conform to this very narrow plan.

106
00:11:55,220 --> 00:11:57,780
So we want to be Agile, but in a very small box.

107
00:11:57,980 --> 00:12:02,320
And I think we have to open that box up through different ways of measuring success.

108
00:12:03,300 --> 00:12:03,760
Yeah, yeah.

109
00:12:03,920 --> 00:12:09,940
I mean, that is always the – measurement always becomes usually the link to compensation.

110
00:12:09,940 --> 00:12:15,900
And then there's a few things that motivate people to act favorably inside the box than that.

111
00:12:16,160 --> 00:12:16,640
Right.

112
00:12:16,820 --> 00:12:22,560
And it's always a difficult challenge to, I don't know, to map those two things together.

113
00:12:22,740 --> 00:12:26,840
You know, one thing you mentioned, you know, as far as the – I don't know what you'd call them,

114
00:12:26,840 --> 00:12:30,640
sort of systems developers, to use another term for hardware plus software folks,

115
00:12:31,200 --> 00:12:43,240
is the – you know, conforming the very – the seemingly rigid sort of demands of developing actual hardware with the looser demands of doing software development.

116
00:12:43,240 --> 00:12:49,440
And it seems like, especially, you know, of all the sort of methodologies or sort of practices you could pick out,

117
00:12:49,500 --> 00:12:56,580
Agile is kind of the most resistant towards kind of like the hard specificity that hardware development would have.

118
00:12:56,580 --> 00:12:59,500
Well, actually, it's interesting because I have worked with hardware developers.

119
00:13:00,300 --> 00:13:10,600
And there is a – in hardware development, there actually is a period of time during the concept and early development phase

120
00:13:10,600 --> 00:13:13,200
where Agile really does fit in.

121
00:13:13,560 --> 00:13:22,040
And at the point where you really turn from bits to atoms, so you go from looking at things as simulation models

122
00:13:22,040 --> 00:13:29,400
or as breadboards or, you know, engineering mock-ups or something like that, once you then go to –

123
00:13:29,400 --> 00:13:39,740
so, for example, one of my clients was building mass spectrometers and they had these ion chambers, titanium ion chambers.

124
00:13:39,740 --> 00:13:43,460
Once you start buying those kinds of things, you've committed a lot of cost.

125
00:13:43,560 --> 00:13:45,100
And so, the cost of change goes up.

126
00:13:45,720 --> 00:13:51,220
So, in a hardware project, you actually have a front end that is agile and a back end that is more traditional.

127
00:13:52,000 --> 00:13:57,180
And if you can do that, you can actually come out a lot better with hardware projects.

128
00:13:57,540 --> 00:14:00,160
But it's very difficult to get a team who can do both.

129
00:14:01,620 --> 00:14:02,020
Yeah.

130
00:14:02,300 --> 00:14:06,880
I mean, there's that certain, like, extreme flexibility at the beginning, but then you better lock it down

131
00:14:06,880 --> 00:14:10,680
or it does – it becomes immeasurably more expensive to change things at the end.

132
00:14:10,860 --> 00:14:11,460
That's right.

133
00:14:11,560 --> 00:14:13,640
And it's all around cost of change.

134
00:14:13,740 --> 00:14:19,220
And so, one of the strategies that I talk about in the project management book is that even if you're in hardware development,

135
00:14:19,380 --> 00:14:25,960
that the longer you can keep development in bits rather than atoms, the more flexibility and adaptability you're going to have.

136
00:14:25,960 --> 00:14:35,440
Yeah, it's interesting also, there's – when I've had this discussion with sort of systems thinking people about how you apply any sort of software development

137
00:14:35,440 --> 00:14:41,180
or how you get more of the flexibility of software involved in hardware when you combine these two things together,

138
00:14:41,700 --> 00:14:49,700
it always brings up the sort of like the devilishly counterintuitive thing about agile that it actually is a very highly disciplined approach to doing things.

139
00:14:49,700 --> 00:14:54,840
Or I should say it brings as much discipline as you sort of want to apply to it, including quite a bit.

140
00:14:55,420 --> 00:15:00,460
And that it's interesting looking at other ways of going about software development

141
00:15:00,460 --> 00:15:07,080
and realizing that in certain forms, agile development has actually a fair amount of discipline

142
00:15:07,080 --> 00:15:11,520
when compared to the hardware development discipline that you have.

143
00:15:12,060 --> 00:15:16,060
And that there's actually the chance for a lot more compatibility between agile software development

144
00:15:16,060 --> 00:15:20,600
and the discipline in embedded systems than there is in sort of other methodologies

145
00:15:20,600 --> 00:15:25,620
that sort of expect a lot more change down the road necessarily.

146
00:15:26,220 --> 00:15:26,340
Right.

147
00:15:26,340 --> 00:15:32,020
And it does seem like there's an interesting opportunity there that isn't sort of immediately intuitive at first.

148
00:15:32,780 --> 00:15:33,600
I think so.

149
00:15:33,680 --> 00:15:37,580
And I think it's a little more difficult in the hardware environment.

150
00:15:37,640 --> 00:15:41,880
But I also think that it's pretty important.

151
00:15:42,020 --> 00:15:48,780
Preston Smith, for example, is kind of a hardware developer who's sort of the agile hardware development,

152
00:15:49,400 --> 00:15:51,780
has written a book on flexible product development.

153
00:15:52,460 --> 00:16:00,180
And so trying to bring that idea of flexibility, adaptability, experimentation, innovation into the hardware realm.

154
00:16:00,880 --> 00:16:06,340
And it's a little bit more difficult there, but not impossible.

155
00:16:06,940 --> 00:16:07,360
That's right.

156
00:16:07,900 --> 00:16:12,420
I think there's a reason that there's an extreme difference between hardware and software people.

157
00:16:12,560 --> 00:16:16,560
It's just sort of different mindsets that enjoy those problem sets.

158
00:16:16,840 --> 00:16:17,020
Yeah.

159
00:16:18,340 --> 00:16:28,640
Jim, allow me to stay for one more minute on this point of hardware use software, as Koze has just mentioned.

160
00:16:30,380 --> 00:16:42,100
If I do an agile project within the context of an overall environment in which there are a bunch of waterfall projects,

161
00:16:42,620 --> 00:16:51,540
what would be your good counsel in terms of being able to run with an agile project in an unconstrained manner?

162
00:16:52,280 --> 00:16:58,820
Namely, in the context of a component development which has both software and hardware,

163
00:16:59,460 --> 00:17:04,440
you recommended to stay as long as you can with the bits instead of the atoms.

164
00:17:04,980 --> 00:17:15,680
What would be your good counsel about an agile project in the context of some waterfall project or some linear phase gates?

165
00:17:17,680 --> 00:17:23,000
Well, obviously, you know, I mean, that's an issue when people are doing big projects,

166
00:17:23,140 --> 00:17:26,980
when they're doing enhancements on big legacy projects.

167
00:17:28,240 --> 00:17:31,200
And really, it's a matter of synchronization.

168
00:17:32,460 --> 00:17:38,640
So you may have an agile project that's running on two- or three-week iterations,

169
00:17:39,320 --> 00:17:43,980
but every now and then you have a milestone or call it the end of a wave

170
00:17:43,980 --> 00:17:48,540
where you have something that links up to a hardware project.

171
00:17:48,540 --> 00:17:53,820
So maybe you have a hardware project that's running two-month iterations or three-month iterations.

172
00:17:54,540 --> 00:18:00,440
In the beginning, maybe the hardware projects are running even faster iterations on breadboards and mock-ups kinds of things.

173
00:18:00,440 --> 00:18:11,260
So it really, at that point, is a matter of synchronizing the various timeframes at some integration milestone.

174
00:18:12,800 --> 00:18:22,760
And then also, if there are some dependencies, is to, you know, work ahead of time on some of those dependencies,

175
00:18:23,520 --> 00:18:28,500
just as you would if you had, for example, two waterfall kind of projects running in parallel.

176
00:18:28,840 --> 00:18:34,480
You wouldn't wait until the final bell until you looked at some of the interdependencies.

177
00:18:35,340 --> 00:18:37,380
So you do the same thing with an agile project.

178
00:18:37,380 --> 00:18:40,200
So, you know, it requires more coordination.

179
00:18:40,380 --> 00:18:43,060
It requires more dependency management.

180
00:18:43,300 --> 00:18:52,320
It requires more looking at just what's going to be available to integrate, for example, at each of the synchronization points.

181
00:18:52,800 --> 00:19:02,760
But that's one of the ways in which you could have an agile team working within an overall project that was, say, a waterfall team,

182
00:19:02,840 --> 00:19:05,340
but you were just starting up with agile.

183
00:19:05,340 --> 00:19:14,180
It does make sometimes a little bit more difficulty in terms of testing harnesses and testing cases and continuous integration.

184
00:19:14,580 --> 00:19:23,660
It makes it a little more difficult to do, but it can be done for both an agile software project and a hardware project

185
00:19:23,660 --> 00:19:30,820
or an agile software project running in parallel with some traditional waterfall software project.

186
00:19:32,020 --> 00:19:33,180
Understood. Thank you.

187
00:19:33,980 --> 00:19:40,500
So one of the other four new areas you were talking about was sort of release planning, essentially.

188
00:19:40,840 --> 00:19:47,980
And to your point, as you were saying, a lot of the focus on agile software development is on the iteration planning

189
00:19:47,980 --> 00:19:49,300
and focusing on the iteration.

190
00:19:49,300 --> 00:19:57,660
And, you know, usually the idea of release planning, it can seem kind of and gets treated sometimes like sort of obligatory bookends

191
00:19:57,660 --> 00:19:58,680
on a bunch of iterations.

192
00:19:59,420 --> 00:20:07,040
And so I wonder, I mean, it sounds like, you know, you're trying to suss out some more, make release planning more than an obligatory bookend, essentially.

193
00:20:07,260 --> 00:20:07,420
Yeah.

194
00:20:07,660 --> 00:20:09,420
And I wonder how that's evolved for you.

195
00:20:09,780 --> 00:20:10,880
I think that's really critical.

196
00:20:11,400 --> 00:20:15,380
I have always, since the beginning, stressed release planning over iteration planning.

197
00:20:15,380 --> 00:20:21,500
I figure if you've got a good iteration plan, then iteration planning just kind of falls out.

198
00:20:21,500 --> 00:20:26,080
So I've always looked at looking at the entire release as important.

199
00:20:26,720 --> 00:20:35,700
One of the things that I have gotten feedback from managers here in this country, in Australia, New Zealand, in Germany,

200
00:20:36,120 --> 00:20:43,200
and several other places is that they have agile teams who are basically working at an iteration at a time level

201
00:20:43,200 --> 00:20:49,800
and don't want to answer questions like, well, how long is this project going to take or how much is it going to cost?

202
00:20:49,940 --> 00:20:52,380
You know, give me some constraints on this project.

203
00:20:53,240 --> 00:20:57,120
And, you know, the response from some of these teams is, well, that's not agile.

204
00:20:58,380 --> 00:21:03,580
And in many companies, you know, you have to have some budgeting types of things.

205
00:21:03,640 --> 00:21:04,840
You have to have some scheduling.

206
00:21:05,240 --> 00:21:09,980
Whether it's internal and you need to know when to get people trained or ready for the release

207
00:21:09,980 --> 00:21:14,760
or whether you've got a product that's going to the marketplace and you've got to have, you know,

208
00:21:14,760 --> 00:21:18,800
there's a lot of marketing stuff that's got to go into place for a big product release.

209
00:21:19,460 --> 00:21:28,280
And so there's some reaction in the agile community to having scope and schedule kind of nailed down for them before.

210
00:21:28,860 --> 00:21:32,280
And now the alternative is not to do any of that.

211
00:21:32,840 --> 00:21:36,180
And so I think it's, you know, fairly important to do that.

212
00:21:36,760 --> 00:21:43,940
So, you know, and also to have multi-level plans and not just a story and a feature level,

213
00:21:43,940 --> 00:21:53,440
but maybe a capability feature and story level so that you look at, say, a product roadmap for a year or 18 months

214
00:21:53,440 --> 00:21:56,740
at the level of a business capability or a product capability.

215
00:21:57,140 --> 00:22:02,400
You look at a release plan, maybe a three- to six-month release plan at a feature level,

216
00:22:02,640 --> 00:22:05,060
and you look at an iteration plan at a story level.

217
00:22:05,060 --> 00:22:18,700
So you're trying to have some long-range plans, but at a high enough level that you don't spend an enormous amount of time actually working on those plans,

218
00:22:18,700 --> 00:22:26,540
but they give you sort of a feasibility of the project and some broad constraints on that project.

219
00:22:26,740 --> 00:22:35,380
Yeah, I mean, you know, part of what you're saying is the classic forest and trees problem where you spend all your time focusing on iterations and different features.

220
00:22:35,540 --> 00:22:41,540
And it could become easy to kind of lose track with the sort of end goal with the release that you're doing all these iterations for.

221
00:22:42,160 --> 00:22:51,020
And then definitely as the rest of the company kind of looks at a chunk of software as what you end up with at the end rather than maybe what you have every, you know,

222
00:22:51,080 --> 00:22:55,760
whatever, whether it's, you know, weekly or monthly or whatever iterations that you have, you know,

223
00:22:55,840 --> 00:23:02,720
especially, you know, when you raise up marketing concerns, that seems like one of the areas where if you were an ISV, for example,

224
00:23:02,720 --> 00:23:11,180
or someone selling a product built on top of the software, the marketing people, if they hadn't spent a lot of time getting involved and seeing the evolution of the software,

225
00:23:11,320 --> 00:23:17,780
would sort of be probably not too delightfully surprised at what release they end up with at the end.

226
00:23:17,800 --> 00:23:22,620
Right. One of the things that I sometimes talk about is the difference between iteration and oscillation.

227
00:23:23,280 --> 00:23:31,620
And if you don't have an overall plan, a release plan that you're looking at, have some sort of theme for your development effort,

228
00:23:31,880 --> 00:23:37,980
you get so caught up in iterations that you can actually get to oscillating rather than iterating.

229
00:23:38,020 --> 00:23:42,280
In other words, you're just kind of going around in circles rather than progressing towards some goal.

230
00:23:42,800 --> 00:23:50,660
And that can be either at a requirements level, you're just sort of, you know, going back and forth and back and forth on some kind of minor requirement,

231
00:23:50,880 --> 00:23:55,160
or at a technical level where you're just sort of refactoring and refactoring and refactoring.

232
00:23:55,800 --> 00:24:03,220
And, you know, it's getting technically just minutely better each time, but you're really not progressing towards the overall goal of the project.

233
00:24:03,220 --> 00:24:12,320
Yeah. So, you know, I'm curious, you know, for as much sort of subtle bashing as we've done sort of to the teams paying attention to the iteration,

234
00:24:13,420 --> 00:24:18,880
like how can people on the other side of that, sort of whether they're marketing folks or the budget folks,

235
00:24:18,940 --> 00:24:26,660
like how can they kind of interact with the development process to kind of aid, to make better keeping your eye on the goal

236
00:24:26,660 --> 00:24:29,400
and like keeping an eye on the final release?

237
00:24:29,400 --> 00:24:39,260
I mean, is it sort of like something that you do kind of on a day-to-day or an iteration process to kind of guide the team or teams towards what this final release is?

238
00:24:39,260 --> 00:24:47,740
It can be at a couple of different levels. It can be at the, let's say that I have a roadmap, a product roadmap.

239
00:24:48,040 --> 00:24:55,300
Well, it may be that some of the marketing people get in and salespeople get involved at that product roadmap and or the release planning level,

240
00:24:55,420 --> 00:25:00,360
but don't get as much involved at the iteration planning and development level.

241
00:25:00,860 --> 00:25:05,680
And so you have product specialists that are getting involved at the detail level.

242
00:25:05,780 --> 00:25:10,460
And maybe you have the product manager who really doesn't get quite as involved at that level.

243
00:25:10,460 --> 00:25:17,480
So you may have different levels of involvement given the different levels of planning and not only in the planning,

244
00:25:17,480 --> 00:25:23,800
but also, for example, maybe the product specialists or the people that are working directly with the iteration,

245
00:25:24,220 --> 00:25:28,240
they get to look at the feature demos at the end of the iteration,

246
00:25:28,240 --> 00:25:40,440
but maybe at the end of a milestone that the product manager, the people that were involved in the release and or the road mapping,

247
00:25:40,660 --> 00:25:45,860
they get involved in a demo of those major features or capabilities.

248
00:25:45,860 --> 00:25:56,600
So that's also part of this kind of the scaling issue is different size components, different pieces of the organization, different lengths of time.

249
00:25:57,200 --> 00:26:03,180
And so I think you do get those marketing and salespeople involved, but maybe just not every iteration.

250
00:26:03,740 --> 00:26:05,100
Right. That's interesting.

251
00:26:06,060 --> 00:26:15,880
So one of the other areas you were talking about was the always interestingly titled – sort of technically titled scaling up a team if you're self-organizing teams.

252
00:26:16,180 --> 00:26:24,660
And, I mean, first off, I mean, what – when you use that word scaling, like what do you mean exactly by scaling a self-organizing team up?

253
00:26:25,160 --> 00:26:31,400
Well, there – to me, there were two kinds of scaling issues, scaling up, which means bigger projects,

254
00:26:31,480 --> 00:26:33,700
and scaling out, which means distributed projects.

255
00:26:34,320 --> 00:26:43,460
And the scaling up is what happens if you have a 600-person team versus a 10- or 15-person team.

256
00:26:44,120 --> 00:26:52,800
And there are a couple of major factors in there, one of which is the organizational design,

257
00:26:53,340 --> 00:26:56,980
the second of which is communication collaboration design,

258
00:26:57,140 --> 00:27:03,740
and the third of which is something that very few people talk about, which is decision design.

259
00:27:04,320 --> 00:27:10,540
How do decisions get made in a 500-person team versus a 15-person team?

260
00:27:11,000 --> 00:27:16,180
You can't have all 500 people involved in every detailed decision that the team makes.

261
00:27:16,820 --> 00:27:27,900
And so how you design how those decisions are made then turn into working agreements between teams on this overall large team.

262
00:27:28,120 --> 00:27:36,420
And just like you have within an agile team, you have a set of working agreements between team members as to how they're going to work together.

263
00:27:36,760 --> 00:27:40,240
You have working agreements at a team-to-team level.

264
00:27:40,640 --> 00:27:45,860
And a lot of those things have to do with who gets to make what kinds of decisions.

265
00:27:47,020 --> 00:27:54,320
So I think all three of those things, decision-making, communications collaboration design, and organizational design,

266
00:27:54,640 --> 00:27:59,220
go into designing a large agile team.

267
00:27:59,900 --> 00:27:59,960
Right.

268
00:28:00,160 --> 00:28:04,260
So it sounds like you sort of established some principles, if you will.

269
00:28:04,500 --> 00:28:12,980
And then, I mean, I guess one of the dangers you have with scaling in any direction is you end up spending a lot of time on communications channels

270
00:28:12,980 --> 00:28:18,320
and syncing up and kind of passing around the baton of authority to let people make decisions.

271
00:28:19,080 --> 00:28:26,440
And it sounds like what you're getting at is you try to establish some rules that allow intra-team decisions to be made

272
00:28:26,440 --> 00:28:30,800
without having to call lengthy meetings, you know, to ground it a little bit at the same time.

273
00:28:30,800 --> 00:28:36,200
And coming up with a way that, you know, who's sort of responsible for making this decision

274
00:28:36,200 --> 00:28:41,880
and who should you talk with about making these different decisions and kind of progressing without –

275
00:28:41,880 --> 00:28:46,080
I mean, I guess once you clearly decide – once you clearly define how decisions are made,

276
00:28:46,520 --> 00:28:51,300
you can spend a lot less time each time a major decision comes up figuring out how you're going to make a decision.

277
00:28:51,680 --> 00:28:52,280
That's right.

278
00:28:52,280 --> 00:29:01,080
And you also know – you also know, you know, and one of the most important things in this is that teams that have some input to those decisions

279
00:29:01,080 --> 00:29:05,300
feel like they have some input and some influence on the decisions.

280
00:29:05,640 --> 00:29:12,260
And so you may have – for example, if you have an architecture team, you'll have membership in an architecture team

281
00:29:12,260 --> 00:29:16,700
from all the feature teams or several of the feature teams.

282
00:29:17,340 --> 00:29:22,240
Their senior people or developers or testers will be part of that architecture team.

283
00:29:22,240 --> 00:29:30,460
So they get direct input to the decisions and they also get involved in those decisions.

284
00:29:31,060 --> 00:29:33,180
And so there's cross-linking between teams.

285
00:29:33,540 --> 00:29:37,460
And one of the things that does happen, you know, in larger teams, like you say,

286
00:29:37,520 --> 00:29:41,300
is you do feel – spend more time on communication and collaboration.

287
00:29:41,300 --> 00:29:44,180
It's just part of having a bigger team.

288
00:29:44,180 --> 00:29:49,060
One of the – one of the phenomenas that I've found very interesting in bigger projects

289
00:29:49,060 --> 00:29:57,940
is you'll have agile teams who are basically customers of other agile teams.

290
00:29:58,000 --> 00:30:02,560
In other words, another agile team will have some component that they need to deliver.

291
00:30:03,160 --> 00:30:10,780
And the first agile team who is the customer of the other agile team, they're the worst customers in the world.

292
00:30:12,120 --> 00:30:16,220
They don't want to take the time to do the requirements, to do the acceptance testing,

293
00:30:16,340 --> 00:30:19,360
to do the – you know, to talk about the requirements.

294
00:30:19,880 --> 00:30:23,760
If their customers treated them that way, they would raise hell.

295
00:30:24,300 --> 00:30:28,000
But they're willing to treat other teams that way when they're the customers.

296
00:30:28,000 --> 00:30:32,480
And so that's one of the things that I talk about with a lot of teams, bigger teams,

297
00:30:32,620 --> 00:30:41,400
is how you have to be sometimes a customer and put that time and energy into being a customer.

298
00:30:41,900 --> 00:30:42,060
Yeah.

299
00:30:42,180 --> 00:30:47,480
I mean, there's sort of – I guess as you scale things up, there's the – you have to apply the golden rule a lot more

300
00:30:47,480 --> 00:30:52,520
than you would if you were in small scale because you're expected to behave in that role.

301
00:30:52,620 --> 00:30:59,120
Yeah, that is interesting to – I can imagine that especially in software development teams would prefer not to have

302
00:30:59,120 --> 00:31:05,380
the luxurious amount of specification it takes to actually figure out what, you know, what someone wants to code.

303
00:31:06,040 --> 00:31:10,660
And there's sort of like this assumption that because we're all developers, we can kind of like, you know,

304
00:31:10,720 --> 00:31:13,720
just wink and nod at each other and understand what the requirements are.

305
00:31:14,600 --> 00:31:22,060
But what's interesting is that the agile team who's the customer, also they tend to make completely unreasonable demands

306
00:31:22,060 --> 00:31:24,000
on the component teams that are feeding them.

307
00:31:24,520 --> 00:31:24,640
Right.

308
00:31:25,000 --> 00:31:29,000
It's like, again, if their customers, you know, treated them like that, they'd be really upset.

309
00:31:29,540 --> 00:31:37,700
But they don't see themselves in the role of a customer in that kind of inter-team component that gets done.

310
00:31:37,800 --> 00:31:39,960
They don't really see themselves in the role of a customer.

311
00:31:40,140 --> 00:31:42,620
And oftentimes I have to point that out to them.

312
00:31:42,740 --> 00:31:47,860
Yeah, they start giving requirements like feature must be robust and enterprise-grade

313
00:31:47,860 --> 00:31:51,060
and other big things that make no sense.

314
00:31:51,360 --> 00:31:51,560
Right.

315
00:31:51,620 --> 00:31:54,720
Or we must have it by this iteration as opposed to –

316
00:31:54,720 --> 00:31:55,200
Even better.

317
00:31:56,840 --> 00:31:57,400
That's right.

318
00:31:57,400 --> 00:32:09,240
Jim, what do you see as the effect of the scaling out on the set of scale-up problems that we have just discussed?

319
00:32:09,420 --> 00:32:17,160
Obviously, at a certain point in time, any scaling up would become, by necessity, a scale-out as well.

320
00:32:17,820 --> 00:32:19,920
How do you see the interplay between the two?

321
00:32:21,780 --> 00:32:30,960
Usually, I sort of like Dean Leffingwell's comment that at scale all projects are distributed.

322
00:32:31,820 --> 00:32:42,360
A couple of pieces of data from some studies that were done a few years ago that collaboration begins to break down significantly at distances exceeding 50 feet.

323
00:32:43,540 --> 00:32:51,180
And that knowledge sharing, informal knowledge sharing begins to break down pretty quickly in groups exceeding a couple hundred.

324
00:32:52,080 --> 00:33:01,040
And so, particularly on the collaboration thing, if you have a – you know, if you have a big team, if you have, you know, 100, 200 people on a team,

325
00:33:01,540 --> 00:33:08,820
they're probably going to be at least on different floors of a building or in different areas of a building.

326
00:33:09,320 --> 00:33:18,000
And I know with one large team of about 600 a few years ago, I came up with the term virtual co-location.

327
00:33:18,620 --> 00:33:23,920
And what I wanted them to do is I wanted them to act as if they were co-located even when they weren't.

328
00:33:24,940 --> 00:33:38,780
I think – so I think that in general, the communication, collaboration, issues, tools that you have are the same for large projects as they are for distributed projects.

329
00:33:39,000 --> 00:33:47,560
In distributed projects, then you have another set of constraints, which tends to be distance, number one,

330
00:33:47,680 --> 00:33:55,080
because even if you're in the same building, you can get together to do iteration plans or release plans pretty inexpensively.

331
00:33:55,180 --> 00:33:57,600
If you distribute it, that's more expensive.

332
00:33:58,280 --> 00:34:04,800
So distance does have some impact on the team and being able to get together to do stuff.

333
00:34:05,760 --> 00:34:14,340
Company cultures and country cultures tend to impact here, and also time zones, as you know from your projects, Israel.

334
00:34:14,520 --> 00:34:21,880
So there are some additional factors with distributed projects over and above just larger projects.

335
00:34:21,880 --> 00:34:26,940
But once you start talking about the issues of communication and collaboration in large projects,

336
00:34:27,160 --> 00:34:33,300
many of those things are the same kinds of issues you deal with in distributed projects.

337
00:34:34,300 --> 00:34:44,140
I could not agree more, and as a matter of fact, I would say we dealt in certain cases with distribution in a very expensive manner.

338
00:34:44,400 --> 00:34:50,480
Maybe we would fly at least for a few days, or then for more than a few days,

339
00:34:50,480 --> 00:34:57,920
we will fly folks from offshore locations, either to Austin, Texas or to Houston, Texas,

340
00:34:58,240 --> 00:35:02,980
in order to be able to be able to, at least for a period of time, to be co-located.

341
00:35:02,980 --> 00:35:10,120
So my own experience has been that overcoming the difficulties of distribution,

342
00:35:10,760 --> 00:35:19,940
or distributed environments, or scale out, as you call it,

343
00:35:20,340 --> 00:35:27,440
really requires additional investment of money, so you have got to plan and budget for it.

344
00:35:27,440 --> 00:35:38,140
Otherwise, the mechanisms of communication and collaboration, which are available across the fund, are often insufficient.

345
00:35:38,800 --> 00:35:44,420
Right. So when I look at scaling and distribution factors, I look at the product architecture.

346
00:35:44,920 --> 00:35:55,440
For example, do you have a piece of the product that you can pull off that's really separable from the rest of it to give to a distributed team or not?

347
00:35:55,500 --> 00:35:57,540
If it's highly integrated, that's one issue.

348
00:35:59,000 --> 00:36:03,340
Relationships. Do the people who are distributed have existing relationships?

349
00:36:03,480 --> 00:36:05,120
So they're pretty well unknown to each other.

350
00:36:05,860 --> 00:36:13,380
And then project complexity, you know, how big, how many people, how distributed is it, those kinds of things.

351
00:36:13,700 --> 00:36:17,420
And then the particular practices that you're using.

352
00:36:17,560 --> 00:36:23,300
So, for example, one of the things you said is you brought together people together to do release planning.

353
00:36:24,100 --> 00:36:32,720
And release planning is a fairly involved practice where you really do need to get high levels of communication and understanding.

354
00:36:33,280 --> 00:36:45,220
As opposed to, for example, a daily stand-up meeting, which can be done over the telephone fairly easily, doesn't require, it's not as complex a practice as release planning.

355
00:36:45,440 --> 00:36:54,900
So what you have to do is to look at those scaling and distribution factors in terms of how you design the communication and collaboration.

356
00:36:55,740 --> 00:37:01,080
Yeah, you'd like to have everybody be able to get together every day, but that may not be possible.

357
00:37:01,080 --> 00:37:12,380
So you look at those things where it really is imperative that they get together, and you use the higher cost modes, if you will, for those kinds of things.

358
00:37:14,140 --> 00:37:14,660
Indeed.

359
00:37:15,780 --> 00:37:26,840
So I guess to round out the four areas, the other area that you said you were adding in the new edition was more detail on metrics and measuring.

360
00:37:26,920 --> 00:37:30,780
Well, it actually is more strategic than detail.

361
00:37:31,260 --> 00:37:31,620
Right, right.

362
00:37:31,940 --> 00:37:44,880
So if I look at agile projects and I say, what are the things that I really am interested in and the things that are most important?

363
00:37:45,280 --> 00:37:47,780
Number one is value.

364
00:37:47,780 --> 00:37:52,100
And so, but I want to look at value from a strategic perspective.

365
00:37:52,520 --> 00:37:56,580
I'm not looking at the detailed requirements or even the detailed stories.

366
00:37:56,860 --> 00:38:06,560
I want to ask the question, have we done enough on this project or product so that I can release this product to the customer use?

367
00:38:06,620 --> 00:38:16,240
So I'm looking at is this product releasable and did we do it within certain business objectives and constraints?

368
00:38:16,540 --> 00:38:17,760
So number one is value.

369
00:38:18,200 --> 00:38:21,340
Number two is actually quality.

370
00:38:22,040 --> 00:38:41,900
And quality is the thing that enables you to deliver value over time because if I deliver value in this first release of the project, but the technical quality is so low and the technical debt is so high that the second release is very difficult to do, then I haven't really gotten the full continuous value out of this thing.

371
00:38:41,900 --> 00:38:47,140
So reliable, so reliable, adaptable product is the quality aspect, which is number two.

372
00:38:47,960 --> 00:38:50,600
And then the third is really what I call constraints.

373
00:38:51,220 --> 00:38:56,040
And constraints are the traditional measures of cost, schedule, and scope.

374
00:38:56,700 --> 00:39:01,560
So cost and schedule aren't goals.

375
00:39:01,920 --> 00:39:02,760
They're constraints.

376
00:39:03,760 --> 00:39:05,920
And even scope is not a goal.

377
00:39:05,920 --> 00:39:12,560
It's a constraint on do I have enough capability to release this project.

378
00:39:13,300 --> 00:39:25,660
And so one of the things I'm really looking at here is really a big shift from looking at the traditional project management iron triangle of scope, schedule, and cost,

379
00:39:26,260 --> 00:39:33,380
and then really looking at kind of fuzzier quantities of value and quality.

380
00:39:33,560 --> 00:39:34,940
They're fuzzier, but they're more important.

381
00:39:34,940 --> 00:39:43,620
And to me, it's much more important to have a fuzzy measure of something that's really important than a precise measure of something that's less important.

382
00:39:44,000 --> 00:39:45,240
Like lines of code or something like that.

383
00:39:45,240 --> 00:39:47,280
Like lines of code or even like cost and schedule.

384
00:39:47,440 --> 00:39:52,140
Cost and schedule are measurable, but they're not necessarily the most important thing.

385
00:39:52,140 --> 00:40:15,320
In fact, there's a quote somewhere in the material from a CIO of a company who basically said that it was more important to meet scope and schedule and produce lower business value than to have a project that was over budget and over schedule and of a lot of business value because that's how they were measured.

386
00:40:15,320 --> 00:40:15,660
Yeah.

387
00:40:15,660 --> 00:40:23,840
And if that's the way we're going to measure people, then we're not going to be successful, I don't think, getting agile implemented in big organizations.

388
00:40:23,840 --> 00:40:26,780
That we have to really focus on these other things.

389
00:40:27,200 --> 00:40:31,920
And quite frankly, I've had enormous response to this.

390
00:40:33,200 --> 00:40:35,740
I haven't had anybody yet say, oh, this is crazy.

391
00:40:36,120 --> 00:40:39,500
I have had people say, I'm not sure this will fly in my organization.

392
00:40:40,000 --> 00:40:42,720
Yeah, well, that's usually the response that means you're on to something.

393
00:40:44,660 --> 00:40:51,380
But, again, I want people to think of the strategic issues around value and quality.

394
00:40:52,160 --> 00:41:02,840
And interestingly enough, once you start focusing upper management on those things, their sort of focus on cost and schedule decreases.

395
00:41:04,240 --> 00:41:09,820
You know, they can see that they're getting value, for example.

396
00:41:10,200 --> 00:41:27,400
And then the other thing that's involved in this, too, is what I call the value cost ratio, which is the question, if I can give you 100% of the value for 100% of the cost, or I could give you 90% of the value of this project for 75% of the cost, which one would you pick?

397
00:41:27,780 --> 00:41:28,040
Right.

398
00:41:28,700 --> 00:41:35,420
And my guess is most executives would pick the 75% of cost for the 90% of the value.

399
00:41:35,560 --> 00:41:45,700
And so, by looking at value all the way along an Agile project, you can actually begin to say, where's the right cutoff?

400
00:41:45,800 --> 00:41:47,620
When do I need to actually release this product?

401
00:41:48,000 --> 00:41:56,020
I don't have 100% of the stories that I would really like to have, but I've got the most valuable ones.

402
00:41:56,080 --> 00:41:58,020
I've got the 90% most valuable ones.

403
00:41:58,280 --> 00:42:00,880
And now's the time to cut this project off.

404
00:42:00,880 --> 00:42:06,360
So I think in that way, you actually end up potentially with tremendous cost savings as well.

405
00:42:06,920 --> 00:42:20,220
So when you're kind of looking at organizations like kind of working in this area, you know, bumping up against this or doing it, like where does sort of responsibility rest for figuring out what that value is?

406
00:42:20,220 --> 00:42:31,120
I mean, whether it's kind of like not only sort of figuring out the ratio and deciding which ratio you would want, but sort of collecting the raw data that allows them to kind of figure out what the value is, if you will.

407
00:42:31,200 --> 00:42:37,820
I mean, it's an interesting role to kind of – it's kind of a high-level assessment of like what is it we have here and of what value is it to our customers?

408
00:42:37,820 --> 00:42:50,860
It is, and I think that's a combination of the product manager and the executive sponsor or the executives who are involved in this effort, but the product manager to a large extent.

409
00:42:50,860 --> 00:43:00,140
And I think we have to educate product managers to this value-cost curve and to getting the most value out early.

410
00:43:01,320 --> 00:43:16,640
The problem we've had in the past, I think, is because projects have been so long, they've been, you know, one-year, 18-month projects, that all the product managers are trying to do is get as many features as they possibly can because they know it's going to be another 12 or 18 months before the next release.

411
00:43:17,240 --> 00:43:37,300
And if you can get the releases down to the three- to six-month level, then you can begin to say, you know, by delaying something until the next release or, you know, leaving it on the backlog, it's not as big an ask as it is to ask somebody to forego this for, you know, 18 or 24 months.

412
00:43:37,500 --> 00:43:49,180
And I think we have to have product managers who are looking at it from a, you know, again, from a business value standpoint and not just, you know, getting as many features as I possibly can into this next release.

413
00:43:50,460 --> 00:43:59,380
Yeah, I mean, you know, now that we're kind of talking about this, it seems like doing that assessment seems to be lacking in quite a bit of software.

414
00:43:59,540 --> 00:44:13,080
It's just kind of like having the time to sit back and think, you know, is this software actually, not so, like, you know, instead of, like, are we meeting these deadlines and these metrics and these seemingly arbitrary goals that we have,

415
00:44:13,080 --> 00:44:19,760
but just asking, like, are we actually doing something that's worthwhile is, it doesn't seem to happen ongoing as much as you would assume it would.

416
00:44:19,760 --> 00:44:33,700
And one of the things that, again, that I've added in this book, and it actually is in the advanced release planning chapter, to get people to kind of think this way a little bit better and a little bit more is I'm actually asking people to calculate value points.

417
00:44:34,060 --> 00:44:55,800
So we have story points or story cost, but I'm actually asking people to calculate value, and it's actually a fairly simple allocation, but it can be very powerful in terms of having people focus on value and having some additional information with which to make some decisions about what gets done.

418
00:44:55,920 --> 00:45:01,580
And one of the points I made in the book is that, you know, people are going to say, well, I don't have time to calculate value.

419
00:45:01,900 --> 00:45:04,920
And my response to this is, okay, we don't have time to calculate cost then.

420
00:45:05,480 --> 00:45:05,800
Right, right.

421
00:45:05,860 --> 00:45:18,860
Yeah, it's, I think to that point, it's, and Israel and I have talked about this in past podcasts, there's, I think, I think with an agile mindset, it's always easy to get envious of public web companies,

422
00:45:18,860 --> 00:45:28,480
because they have such a short path, or they can have such a short path to understanding value they're delivering or not delivering, versus sort of like ISVs and bigger enterprise software people.

423
00:45:28,640 --> 00:45:39,580
It can be difficult to get that really fast feedback to determine if some feature you've developed or you haven't delivered yet, if there's like, if there's a huge amount of sort of business and customer value in it.

424
00:45:39,580 --> 00:45:54,220
Right. And so one of the things about this in a lot of situations is just as story points are not absolute costs, they're relative costs, you can do value points that are relative, not absolute.

425
00:45:54,340 --> 00:45:58,320
In other words, they don't have dollars on them, but they're relative to each other.

426
00:45:58,420 --> 00:46:05,000
So within a project, you know what the higher value things are and the lower value things are relatively.

427
00:46:05,980 --> 00:46:06,460
Right.

428
00:46:06,860 --> 00:46:18,880
You would find the following data point from my trip last week to Washington, D.C., where obviously many of the projects are government-type projects.

429
00:46:19,460 --> 00:46:26,380
Their emphasis right now on value and on event value is at a much higher level than I would have expected.

430
00:46:26,720 --> 00:46:45,700
Then I actually stepped out of a whole day with 60, 70 customers, rally customers in D.C., very encouraged by how far they have shifted from the traditional measures into thinking in terms of value.

431
00:46:47,300 --> 00:46:55,000
And that has been a point in the Agile community for quite some time is to focus on value and focus on incremental value.

432
00:46:56,120 --> 00:47:02,980
But we haven't really gotten rid of or changed the overall kind of Iron Triangle approach.

433
00:47:03,060 --> 00:47:12,640
And that's one of the things I'm trying to do here is to put the Iron Triangle scope, schedule, and cost within perspective as constraints.

434
00:47:12,640 --> 00:47:13,960
And they're still important.

435
00:47:13,960 --> 00:47:20,580
And this is a major premise in your book, correct?

436
00:47:21,360 --> 00:47:21,620
Yes.

437
00:47:23,240 --> 00:47:36,260
So, in fact, this is probably the number one driver to the new book is putting this stuff on performance measurement and what I call the Agile Triangle out there.

438
00:47:36,740 --> 00:47:46,800
It has a critical piece of how we have to move in order to get Agile more established in bigger companies.

439
00:47:47,460 --> 00:47:47,860
Yeah.

440
00:47:48,080 --> 00:47:51,340
And to kind of get to the point, we're actually delivering valuable software.

441
00:47:51,600 --> 00:47:54,120
And you have the whole process underneath it that supports that.

442
00:47:54,600 --> 00:47:54,960
Right.

443
00:47:55,440 --> 00:47:58,580
So, we haven't actually mentioned the name of the book now that I think about it.

444
00:48:00,020 --> 00:48:05,300
But before we wrap up, I mean, we've said that it's a second edition of it.

445
00:48:05,360 --> 00:48:09,020
But what's the actual title of the book and what's the availability of it?

446
00:48:09,500 --> 00:48:14,020
It's Agile Project Management, Creating Innovative Products, second edition.

447
00:48:14,680 --> 00:48:24,620
And it is already available on Amazon and Amazon Canada within the next couple of weeks to other countries.

448
00:48:24,740 --> 00:48:26,360
But it is out and available.

449
00:48:27,000 --> 00:48:33,000
And, you know, unless Israel had any other sort of on-topic questions, I just had one little slightly off-topic question.

450
00:48:33,800 --> 00:48:34,200
Okay.

451
00:48:34,760 --> 00:48:37,680
And of course I have an off-topic question, Mike.

452
00:48:37,840 --> 00:48:38,380
You know me.

453
00:48:38,660 --> 00:48:39,340
That's right.

454
00:48:40,340 --> 00:48:41,900
Well, you want to go ahead then?

455
00:48:43,020 --> 00:48:49,160
Well, may I ask you, Jim, to do a retrospective on the past eight years.

456
00:48:49,360 --> 00:48:57,400
You have been one of the originators and signers of the Agile Manifesto just about eight years ago.

457
00:48:58,060 --> 00:49:04,980
When you take a look at the road we have traversed since then, what do you feel?

458
00:49:05,260 --> 00:49:11,000
What is your assessment of what we have done well and what perhaps we have done in a different manner?

459
00:49:11,000 --> 00:49:14,680
Well, it's interesting.

460
00:49:14,880 --> 00:49:17,840
There's a couple of big things happening this year.

461
00:49:19,040 --> 00:49:22,680
They're at the Agile conference in August in a few weeks.

462
00:49:23,220 --> 00:49:32,300
There's going to be a joint launch of the PMI, Project Management Institute, Community of Practice of Agile.

463
00:49:32,460 --> 00:49:36,880
So PMI is getting active in the Agile world.

464
00:49:36,880 --> 00:49:47,540
And earlier this year, we had the Software Engineering Institute who released a paper, 30 or 40-page paper, on how to combine CMM and Agile.

465
00:49:48,340 --> 00:50:00,600
And so you have two of the organizations that have been somewhat antithetical to the Agile movement becoming involved in the Agile movement.

466
00:50:00,780 --> 00:50:02,700
So I think that's significant.

467
00:50:03,220 --> 00:50:12,820
I think it parallels the fact that seven or eight years ago what we did in Agile was really small projects, small transitions.

468
00:50:14,560 --> 00:50:18,800
What I call rogue project teams within organizations were doing Agile.

469
00:50:19,700 --> 00:50:26,880
Three, four, five years, three or four years ago, we started getting more bigger organizations.

470
00:50:27,040 --> 00:50:38,900
Rather than rogue project teams, we would have CIOs or VPs of engineering come to us and say, okay, we want to go Agile with 100 people, 400 people, 500 people.

471
00:50:39,620 --> 00:50:46,080
I did one in 2005, 2006, involved about 600 people in development and engineering.

472
00:50:47,260 --> 00:50:56,000
So that growth in size, and then recently, as I mentioned, I was in China, and this was a potential transition of 25,000 plus,

473
00:50:56,480 --> 00:51:02,660
where you have entire big organizations, and there are a number of these around the world.

474
00:51:03,580 --> 00:51:10,640
IBM, for example, there's pieces of IBM that have mentioned this 25,000 number internally also.

475
00:51:10,860 --> 00:51:14,020
So I think those are positive trends.

476
00:51:15,380 --> 00:51:27,080
On the maybe not so positive trend, I've also seen the reluctance in some Agile circles to be Agile, to be adaptable.

477
00:51:28,000 --> 00:51:36,740
They're sort of hung up on the specifics of one methodology or the other to almost a religious fervor

478
00:51:36,740 --> 00:51:47,980
and are not willing to begin to integrate things from either other Agile practices or things like CMM and PMI.

479
00:51:48,280 --> 00:51:50,320
They are still resistant to that.

480
00:51:50,320 --> 00:51:55,620
So that would be one of my probably comments about something that's not as positive.

481
00:51:58,000 --> 00:51:59,640
Well, that's a nice overview.

482
00:52:00,860 --> 00:52:10,680
So the last question I was going to ask, I noticed that the release date for the Kindle book is like some months after the hard copy book.

483
00:52:11,380 --> 00:52:19,020
And since people are always interested in the Kindle and you're an author, I was curious, do you get involved in the process for converting it to a Kindle,

484
00:52:19,100 --> 00:52:21,360
or is it just sort of like a straight conversion of the book?

485
00:52:21,360 --> 00:52:27,100
Because it seems like there would be different features and things that you could add in if you wanted to spend the time, or maybe not.

486
00:52:27,160 --> 00:52:27,420
I don't know.

487
00:52:27,480 --> 00:52:29,160
I'm kind of curious how that process works.

488
00:52:29,260 --> 00:52:32,560
Well, number one, I don't get involved in it at all.

489
00:52:33,220 --> 00:52:37,140
Number two, the Kindle edition is out already.

490
00:52:37,280 --> 00:52:37,740
Oh, okay.

491
00:52:37,740 --> 00:52:52,360
And in fact, if you look at the Agile project management books list within Amazon, the Kindle version is number two, and the other version, the paperback version is number three.

492
00:52:52,980 --> 00:52:53,840
There you go.

493
00:52:54,700 --> 00:53:03,360
And to kind of follow up on that, I actually asked the publisher about a month or so ago, I said, can I get a Kindle version of my own book?

494
00:53:03,680 --> 00:53:09,440
And, you know, obviously, not having to pay for it, and I don't have an answer to that one yet.

495
00:53:09,780 --> 00:53:10,480
Yeah, yeah, yeah.

496
00:53:10,760 --> 00:53:19,680
I mean, it seems, like I was saying, it seems like there would be extra things you could add into an e-book, like whether it was on a Kindle or like an iPhone or something like that,

497
00:53:19,700 --> 00:53:28,840
that would be kind of a curious thing to lace into a book, but it doesn't sound like, at least in this instance, there's sort of like the opportunity to extend it in that form.

498
00:53:30,920 --> 00:53:32,560
Not that I have seen yet.

499
00:53:32,600 --> 00:53:34,280
Like I said, I didn't get involved in it.

500
00:53:34,600 --> 00:53:34,820
Yeah, yeah.

501
00:53:36,300 --> 00:53:36,520
Huh.

502
00:53:36,640 --> 00:53:37,340
Well, that's interesting.

503
00:53:37,500 --> 00:53:40,900
Well, I mean, thanks for spending all this time to talk with us today.

504
00:53:40,980 --> 00:53:54,760
It was actually like, I think especially the topic on, the discussion on figuring out if you're actually, like, getting a result that's valuable to the business is, I mean, it's always funny to, like, make statements like this,

505
00:53:54,760 --> 00:54:02,920
because, of course, that's what you would be doing with software, but for those people who actually, you know, work in software, it can be a kind of tragically alien notion,

506
00:54:03,060 --> 00:54:14,920
so it's fun to kind of dig around on the practicalities of actually getting to that point where the obvious sort of thing is what actually gets done instead of the sort of cynically unobvious thing.

507
00:54:15,540 --> 00:54:15,700
Right.

508
00:54:16,620 --> 00:54:17,340
Well, that's great.

509
00:54:17,400 --> 00:54:19,280
Well, thanks for talking with us today.

510
00:54:19,560 --> 00:54:19,740
That was a good time.

511
00:54:19,740 --> 00:54:20,220
Well, thank you.

512
00:54:20,300 --> 00:54:20,980
I enjoyed it.

513
00:54:21,320 --> 00:54:21,720
Definitely.

514
00:54:21,720 --> 00:54:22,540
Thanks so much, Ian.